Detector Integration Schedule

news
schedule
pictures


                                                            updated on Dec.26, 2003
                                                                 by H.Okuno


                                                   Dec.1 (Mon)       Restart of the installation work by Hutaba  
                                                   Dec.2 (Tue)        #2
                                                   Dec.3 (Wed)       #3
                                                   Dec.4 (Thu)        #4, #5
                                                   Dec.5 (Fri)          #6, #7, #8
                                                   Dec.6 (Sat)
                                                   Dec.7 (Sun)

                                                   Dec.8 (Mon)       #9, #10, #11
                                                   Dec.9 (Tue)        #12, #13, #14
                                                   Dec.10 (Wed)     #15, #16, #17               
                                                   Dec.11 (Thu)      #18, #19,#20, #21   
                                                   Dec.12 (Fri)        #22, #23, #24        
                                                   Dec.13 (Sat)       #25, #26 ,#27
                                                   Dec.14 (Sun)

                                                   Dec.15 (Mon)     #28,#29, #30
                                                   Dec.16 (Tue)      #31, #32 
                                                   Dec.17 (Wed)     Removal of the installation instruments
                                                   Dec.18 (Thu)      Charge Veto installation    Attach FB vacuum cover
                                                   Dec.19 (Fri)        Charge Veto installation    Attach FB vacuum cover
                                                   Dec.20 (Sat)        Charge Veto installation    FB vacuum test
                                                   Dec.21 (Sun)

                                                   Dec.22 (Mon)   Reserve
                                                   Dec.23 (Tue)   
                                                   Dec.24 (Wed)   Cooling pipe installation
                                                   Dec.25 (Thu)    PMT attachment
                                                   Dec.26 (Fri)      PMT attachment              <--- current status
                                                   Dec.27 (Sat)      Cable connection etc.
                                                   Dec.28 (Sun)         

                                                   Dec.29 (Mon)     
                                                   Dec.30 (Tue)      
                                                   Dec.31 (Wed)      
                                                   Jan.1(Thu)  
                                                   Jan.2(Fri)
                                                   Jan.3(Sat)
                                                   Jan.4(Sun)

                                                   Jan.5(Mon) 
                                                   Jan.6(Tue) 
                                                   Jan.7(Wed)     Position measurement of the Downstream-section
                                                   Jan.8(Thu)      Remove the Upstream-section Cover(Hutaba)
                                                   Jan.9(Fri)        Positioning of the Middle section(Hutaba)
                                                                          Position measurement of the Upstream-section
                                                                          Installation of the Upstream membrane
                                                   Jan.10(Sat)
                                                   Jan.11(Sun)

                                                   Jan.12(Mon)
                                                   Jan.13(Tue)    Separation of the Upstream-section (Hutaba),
                                                                          Replacement of the tir-tank (Hitachi-zosen)
                                                   Jan.14(Wed)
                                                   Jan.15(Thu)
                                                   Jan.16(Fri)
                                                   Jan.17(Sat)
                                                   Jan.18(Sun)

                                                   Jan.19(Mon)  Installation of the Downstream-section (Hutaba)
                                                   Jan.20(Tue)   Installation of the Downstream-section (Hutaba)
                                                   Jan.21(Wed)  Installation of the Upstream-section (Hutaba)
                                                   Jan.22(Thu)   Positioning of the Integrated Detector (Hutaba)
                                                   Jan.23(Fri)     Cable Rack installation (Hutaba)
                                                   Jan.24(Sat)
                                                   Jan.25(Sun)

                                                   Jan.26(Mon)    Installation of the Vacuum System
                                                   Jan.27(Tue)
                                                   Jan.28(Wed)
                                                   Jan.29(Thu)
                                                   Jan.30(Fri)
                                                   Jan.31(Sat)
                                                   Feb.1(Sun)

                                                   Feb.2(Mon)
                                                   Feb.3(Tue)
                                                   Feb.4(Wed)
                                                   Feb.5(Thu)
                                                   Feb.6(Fri)
                                                   Feb.7(Sat)
                                                   Feb.8(Sun)

                                                   Feb.9(Mon)
                                                   Feb.10(Tue)
                                                   Feb.11(Wed)
                                                   Feb.12(Thu)
                                                   Feb.13(Fri)
                                                   Feb.14 (Sat)
                                                   Feb.15(Sun)

                                                   Feb.16(Mon)     BEAM ON